Tendering processes for a children’s therapeutic home

Following the design stage, a specification for the home will need to be developed which will form the basis for a tender. The specification should include multi-disciplinary advice about how to meet children’s needs.

  • Develop a specification to meet children’s needs
  • Create a tender based on the specification
  • Public procurement rules
  • Contingencies in contracts
  • Award of the contract
  • Due diligence process during procurement

Add here the links as detailed in the page names list.

Return to the Toolkit